
Lee Johnson Chevrolet/Mazda, Kirkland, Foushée and Associates general contractor. The dealership remained fully operational during the demolition and complete reconstruction of the site. The sitework consisted of a storm water detention and conveyance system, sanitary sewer lines and connections to all buildings and a complete water distribution system for domestic, irrigation and fire protection.
Pacific Crest Cabinets Sumner, Panattoni Construction general contractor. Archer provided site preparation and all underground utility installation.



OPUS Northwest, Sumner. Archer provided complete underground utility installation, similar to many other utility projects completed each year.
Oakesdale, Renton, Foushée Associates, general contractor. Archer Construction Installed all of the utilities for the site.
Rainier Industrial Park, Sumner, with Panattoni Construction as general contractor. New utility infrastructures were installed to establish this new industrial corridor off State Route 167. In addition to Storm, Sewer, and Water services, over 5000 feet of Fireline Main was installed.

